25.09.2013
Как обезопасить ваш загородный дом?
The foundation
11.05.2018
The blind area should have a slope from the building at least 2-3% (by a width of a meter 2-3cm levels). At the end of the work, the foundation from the blind area to waterproofing will be plastered by the composition based on lime or cement.
Советуем прочитать
Оставить комментарий