Vertically, on the

16.05.2018

Work begins with the installation of the guide profile around the perimeter of the partition. It is convenient to first fix the profile on the floor (do not forget about the opening under the door), then, on the plumb line, strictly vertically, on the walls, and then on the ceiling.

Советуем прочитать
Оставить комментарий

Добавить комментарий

Имя:

E-mail:

Капча загружается...