Безопасность в доме
29.05.2018
Installation of this

Then we install a vertical profile.

29.05.2018
We perform the

At the marked line, attach the UD profile.

29.05.2018
In mind that you

Make markings at what distance the construction building will be located.

29.05.2018
Dowels and self

Metal profile CD and UD and P Figure mount.

29.05.2018
A special metal

The frame can be made of a special metal profile or from a wooden beam.

29.05.2018
The frame method for expressing walls: process features

It is a simple, fairly simple and fast method to sheathe walls with drywall, it is also the cleanest.

29.05.2018
At this

At this stage, the insulation and alignment of the walls is over, then you should move directly to the interior decoration of the room.

29.05.2018
Foil with adhesive

Drywall sheets are glued to a wall insulated with foil with a foil with adhesive mixture for drywall sheets.

29.05.2018
Use liquid nails

After the primer layers drying out, the entire wall is glued with folgaisole, the thickness of which is 3-5 mm, as glue, it is best to use liquid nails.

29.05.2018
Insulation, the

Before installing sheets of drywall and insulation, the walls should be prepared, namely, clean them of whitewashing, old wallpaper, and so on.


Warning: Use of undefined constant posts_per_page - assumed 'posts_per_page' (this will throw an Error in a future version of PHP) in /home/user56517/web/domfenshuy.net/public_html/wp-content/themes/domfenshuy/functions.php on line 330

Warning: Use of undefined constant paged - assumed 'paged' (this will throw an Error in a future version of PHP) in /home/user56517/web/domfenshuy.net/public_html/wp-content/themes/domfenshuy/functions.php on line 331