Безопасность в доме
21.05.2018
Complex and laborious

After the check, the finishing flooring is laid.

21.05.2018
Work involves

Next, the infrared floor is connected to the thermostat of the connecting wires.

21.05.2018
You can

This operation is also carried out through double -sided tape, without an additional overlap in one layer.

21.05.2018
On top of

On top of it, polyethylene insulation foam is placed on a double -sided tape, upwards reflecting the surface.

21.05.2018
Material is laid

Such actions are performed so that in the future there is no violation of this kind of heating system.

21.05.2018
How to mount an infrared warm floor with your own hands

The installation of infrared warm floor includes several stages.

21.05.2018
Stage is

We give a day to the foam dry and isolate the seams.

21.05.2018
And the frame

If the frame holds reliably, set the wings and double -glazed windows in its place.

21.05.2018
Frame using the

We disassemble a new plastic window and set the frame using the building level.

21.05.2018
Old window and

If you received the window you ordered, we are preparing a place to install it.


Warning: Use of undefined constant posts_per_page - assumed 'posts_per_page' (this will throw an Error in a future version of PHP) in /home/user56517/web/domfenshuy.net/public_html/wp-content/themes/domfenshuy/functions.php on line 330

Warning: Use of undefined constant paged - assumed 'paged' (this will throw an Error in a future version of PHP) in /home/user56517/web/domfenshuy.net/public_html/wp-content/themes/domfenshuy/functions.php on line 331