What materials are used to align the floors

To date, a number of materials are used to align the floors, among which you should distinguish a semi-dry screed, a dry screed, a monolithic sand-cement wet screed, as well as a bulk self-leveling screed.

11.05.2018
To the

After marking, set the door frame by installing.

11.05.2018
The place

After all this, you should mark the place.

11.05.2018
Does not cause

In order for your installation it does not cause unnecessary problems, the doorway is cleaned.

11.05.2018
The old

The last stage contains the installation of accessories, hanging the doors on it.

11.05.2018
Be installed, mount the

The installation of interior doors consists of several stages.

11.05.2018
Is it possible to install an interior door yourself

This article will talk about installing an interior door with your own hands.

11.05.2018
The foundation

The blind area should have a slope from the building at least 2-3% (by a width of a meter 2-3cm levels).

11.05.2018
Which is

Then a blind area is performed, for which the soil is removed around the perimeter to a width of up to a meter and a depth of up to 40 cm and the excavation is poured with concrete, which is desirable to reinforce.

11.05.2018
Then the

Then the solution is poured into the formwork, aligned and after complete drying is closed with roofing material, which should be 2-3cm in both directions.