The floor

15.05.2018

After the first layer of paint has dried well, the floor is painted again. Apply paint along the length of the boards. After the beauty dries (as a rule, it is 4 days), the floor should be washed with hot water without soap and other detergents.

Советуем прочитать
Оставить комментарий

Добавить комментарий

Имя:

E-mail:

Капча загружается...